Welcome to  Shanghai Yiguang Laboratory Equipment Co.,Ltd!

Laboratory Planning/Design

Installation  after-sales in one

+86 15800400050

新闻banner
Your current location: Home >> News >> News Announcement

Contact UsContact Us

Shanghai Yiguang Laboratory Equipment Co.,Ltd

Contact: Mr. Su

Mobile:+86 158 0040 0050

Email:egpplab@126.com

Website: www.egpplab.cn

Production Address:

No. 8 Hongshan Road, Lingbi North Development Zone, Suzhou City, Anhui Province

No. 188 Minfa Branch Road, Yexie Town, Songjiang District, Shanghai

No. 88 Haitai Road, Dongtai City, Jiangsu Province


What installation commissioning work should be done before the operation of exhaust gas scrubber tower?

2020-03-12
second

Shanghai spray tower exhaust gas scrubber tower to do what installation commissioning work before running?


With the continuous rise of the industrial sector, in bringing us benefits at the same time also brought us some trouble, in which the exhaust gas emitted in the factory has brought great harm to our environment, in order to reduce the hazards of exhaust gas, exhaust gas scrubbing tower is widely used in industrial production, to provide a guarantee for the quality of our air, the exhaust gas scrubbing tower is a kind of gas purification treatment equipment. Improved on the basis of floatable packing layer gas purifier, it is applied to pre-treatment of industrial exhaust gas purification dust removal. Because its working principle is similar to the washing process, it is called exhaust gas scrubber tower. It consists of tower body, tower plate, reboiler condenser. In the process of using the reboiler is generally heated with steam, the condenser with circulating water heat conduction. However, if you want to make the exhaust gas scrubber tower to play a greater use of benefits, then in the installation use of the following points we still need to pay attention to the following problems, in the operation of the exhaust gas scrubber tower before the following steps to ensure that the scrubber tower is working properly.


First, the exhaust gas scrubber installation commissioning process


1, in the installation of exhaust gas scrubber tower, whether it is installed indoors outdoors, must do a good job of pumps fan motor protection, do subject to rain other liquids, so as to avoid malfunctions, electrical appliances can operate normally after moisture. If the glass fiber reinforced plastic purification tower in the outdoor use, in winter should be the bottom of the tower pool part of the anti-freezing measures.


2, every day should check whether the parts are tightened, to ensure that the screws will be loose, the bearing will be damaged.


3, should promptly observe whether there are some debris sucked in.


4, the installation should pay attention to the protection of equipment, do touch the body exposed parts. When the tower flange is connected with the external flange, it should be tightened in the correct way, should be overly forceful so as to crack the flange. Flange gasket shall use steel gasket, can use corrosion oil resistant rubber gasket.


5, after the installation of equipment, water circulation debugging, normal operation without running, bubbling, dripping, leaking, plugging other phenomena.


Second, the use of exhaust gas scrubber tower precautions


1, exhaust gas scrubber equipment should be used before checking the equipment of each system switch valve is intact, the absorption liquid agent selected proportion is normal.


2, the use of the absorbing liquid to meet the specified requirements can be used, the dosage is insufficient, it should be supplemented in a timely manner.


3、When starting the machine, the pump should be started first, then the fan should be started after five minutes.


4, in the closing of the scrubber tower should first shut down the fan after a few minutes, then shut down the pump can be closed at the same time, otherwise it will burn out the motor, clogging filler, affecting the effect of air purification.


5, exhaust gas scrubber tower in use, the fan pump connection line can be changed, should ensure that the running direction is correct, clockwise steering is correct, if the reverse transmission will damage the motor causing accidents.


6, exhaust gas scrubber tower after being put into use, the production unit should send professional personnel to carry out regular maintenance inspection, if abnormalities are found should stop the machine repair after the line.


7, in order to ensure the normal operation of the tower equipment, there must be a person in charge of management, should always check whether the fan, pump operation is normal, whether the spray pipe gas pipe is smooth, whether the liquid storage pool level is normal, make-up water float switch is normal, whether the gas-liquid concentration in the specified range, etc., if found problems should be resolved in a timely manner.


Third, the routine maintenance of exhaust gas scrubber tower


1, first of all, open the window will be filled with internal layer of Lassie ring (ring, Bauer ring, etc.) out, placed in a large container, with a high-pressure water gun will be adhering to the surface of the dirt clean. Don't wash too much in a single pass you won't get it clean. Of course, if there are conditions, re-customized source environmental protection special Lassie ring.


2, for the top of the scrubber tower mist removal layer, the general filler layer of lasix ring regular maintenance cleaning is required to clean. If there is dirt on it, the same steps as above.


3, shower head cleaning. Most of the current installation of the shower head are silk teeth joints, as long as it will be unscrewed rinsed clean. Shower head maintenance, relative to the Lacy ring cleaning frequency to be higher, simple can prepare a set of spray nozzle, does affect the operation of the equipment.


4, supporting accessories: such as fans, pumps, PH, level meters, dosing systems, etc., generally recommended to clean up on their own, need to be in the source environmental protection professionals under the guidance of.

Label

Mobile:+86 15800400050 

Website:www.egpplab.cn

Seat:+86 21-37026685*808

Address:

No. 8 Hongshan Road, Lingbi North Development Zone, Suzhou City, Anhui Province

No. 188 Minfa Branch Road, Yexie Town, Songjiang District, Shanghai

No. 88 Haitai Road, Dongtai City, Jiangsu Province




WeChat





Click to indicate your agreement "Privacy Policy"